Skip to content

Deploy Workspaces

Download Workspace Configurations

Download the Full Client Workspace Configurations (27/10/2026)

CRITICAL: These files are strictly compatible only with module versions 3.x, 4.x, or higher. Do not attempt to use them on older versions.

Extracting the Files

Unzip the downloaded ZIP file to extract the JSON files required for the Google Tag Manager import process.


Import Configurations

The ZIP file contains workspaces divided by tracking platforms. To ensure optimal performance, import only the platforms you require.

Choosing the Import Method

  • First Platform: Use this for new integrations or to clean the entire workspace of previous configurations.
  • Upgrade or Add New Platforms: Use this for module updates or when adding a new tracking service to an existing setup.

First Platform

  1. Navigate to the Admin tab.
  2. Click Import Container.

    Accessing Import Container

  3. Select the configuration file to import.

  4. Select the target workspace.
  5. Choose Overwrite to remove old tags and clean your current workspace.
  6. Click Confirm.

    Configuring Overwrite Import


Upgrade or Add New Platforms

Critical: Use Merge for Platforms

When importing additional platform files into an existing workspace, you must select Merge. Selecting Overwrite will completely erase any previously imported marketing platforms.

Multi-Platform Deployment

Repeat the entire configuration sequence below (Steps 1 to 7) for each separate tracking network (e.g., GA4, Facebook, Google Ads) you want to activate on your server container.

  1. Navigate to the Admin tab.
  2. Click Import Container.

    Accessing Import Container

  3. Select the configuration file to import.

  4. Select the target workspace.
  5. Choose Merge to combine existing tags with the new ones.
  6. Select Overwrite Conflicts.
  7. Click Confirm.

    Configuring Merge Import


Preserve Customizations

If you have modified elements in your workspace, review and preserve your parameters before publishing.

  1. Sort the list to group all modified elements.
  2. Locate elements with known customizations.
  3. Open the right-hand menu and select View Change.

    Reviewing Workspace Changes

  4. Click on each conflict to decide which solution to apply.

    Comparing Configuration Conflicts

    Comparing Changes

    The left panel shows your current configuration (including your custom parameters). The right panel shows the new configuration from the import file.

  5. To preserve your customization, click Copy Change.

    Copying Custom Parameters

  6. Verify that the final configuration includes both your customizations and the new update features.

  7. Click Save.

    Saving Verified Configuration

Note

Repeat this process for every customized element in your workspace.


Publish Changes

After importing and reviewing all changes, you must publish the new configuration to make it live.

  1. Click Submit in the top right corner.

    Submitting Workspace Changes

  2. Select Publish and Create Version.

  3. Enter a descriptive name and summary to identify this version for potential rollbacks.
  4. Click Publish to enable the changes on your site.

    Publishing GTM Version